Etzel Art of Digital Manufacturing
TR Contact us
Tool · OEE and cost

Loss cost calculator

Enter cycle time, downtime and scrap to see how many hours and dollars your line loses each year, and what a good part really costs you.

Lines and shift pattern
Lines running the same product at the same speed
Meal and rest breaks; deducted from planned production time
Cycle time, downtime and scrap
The machine’s design speed or best demonstrated cycle
Average: run time ÷ parts produced, minor stops included
Breakdowns, changeovers, waiting for material
Cost and price
Labor, energy, depreciation and overhead; it accrues even when the line is down
Improvement scenario

The machine captures each stop and the operator picks the reason, so the biggest losses become visible.

The gap between actual and ideal cycle time: minor stops and slow running.

Quality results are entered on the shop floor; scrap reasons and batches are tracked.

Contribution margin lost per year –
OEE
–
Availability
–
Performance
–
Quality
–
True cost per good part –
Cost at ideal cycle time –

Annual loss breakdown

Loss Line hours Parts Value
Downtime loss Availability – – –
Speed loss Performance – – –
Quality loss Quality – – –
Total – – –

–

If you reduce the losses

New OEE –
Additional annual contribution margin –

How the calculation works

Every second is measured against the ideal cycle

Every second of planned production time that doesn’t become a good part is assigned to one of three losses. In parts, a loss is the number of good parts the ideal cycle could have produced in that time.

What is OEE and how is it calculated?
Downtime loss

Time the line is stopped

Unplanned stops and setup per shift × shifts × days. Planned breaks are not part of this loss; they are deducted from planned production time up front.

Speed loss

Gap between actual and ideal cycle

Run time − parts produced × ideal cycle time. Minor stops and slow running show up here.

Quality loss

Time spent making scrap

Scrap parts × ideal cycle time. In both views, the material lost in scrap is also added to this loss.

In dollars

Two views

If demand exceeds capacity, the loss is the contribution margin on parts you could not sell (price − material). If demand is met, the loss is the cost of idle line hours.

Results are an estimate based on the values you enter. Once losses, downtime reasons and cycle times are collected from the machines, the real picture usually differs from the estimate; İldiko MES measures this data live for every line.

Let’s talk about measured loss, not estimates

We collect downtime, speed and scrap data from the machines on one of your lines and, within a few weeks, show you together where the loss is.